Key Points
- Using the matrix provided in this guide can determine if a project is worth pursuing for DMAIC.
- Projects need to be carefully selected, as going about things without a plan can result in disaster.
- A good DMAIC project should be worthwhile for both the customer and the organization.
As anyone involved in Six Sigma knows, selecting the right project is a critical component of project success. If practitioners do not put enough effort into selecting the right opportunity for improvement, a project can end in disaster, or create unnecessary work and complexity for the project team.
Selecting projects with just a few obvious inputs or simply selecting the squeakiest wheel are not always the best methods. These strategies may work at times, especially in tackling the low-hanging fruit, but a more structured approach is required when priorities are not so obvious.
Practitioners need a robust and reliable approach to 1) quickly determine whether the project is indeed a good DMAIC project and 2) prioritize projects to ensure resources are allocated appropriately. A criteria-based selection matrix helps practitioners standardize the project selection process, boosting its reliability.
Making Plans
Sure, you can stick with how you’re currently going about project selection. However, if you find that isn’t making the grade, having a plan in place is only going to help. The criteria highlighted aren’t just things to consider, but important points to construct a project around.
As such, sticking to these criteria while constructing your DMAIC project is going to allow you to see if it is worth the time and energy.
Key Project Criteria
To build and use the criteria-based selection matrix, it is important to understand 15 key pieces of selection criteria:
1. Customer impact
Will the successful outcome of the project have a material impact on customers’ (internal or external) perceptions of quality? A voice-of-the-customer (VOC) analysis with actual customer input would be beneficial in answering this question.
2. Process stability
Is the process relatively stable? If the process is new, has it reached a stable level of performance? Note that “stable” does not necessarily mean that the process is performing as desired (i.e., as per customer specifications). Also, is the process likely to undergo major structural or design changes shortly? Process stability is important in accurately assessing the impact of improvements without the “noise” created by changes within the process.
3. Defect definition
Is the process defect well-defined? If the project does not have a specific element that needs to be fixed, it could become a victim of scope creep and lose its focus. Avoid making the final output (the “big Y‘s”) the measure of defect. For example, high costs, poor customer satisfaction rates or not achieving revenue targets can work as high-level problems to tackle, but are not ideal “defect metrics.” The defect metrics should be operational. Examples of appropriate defect metrics include cycle time, error rates, rework rates, first-time call handling percentage, straight-through processing rates, lead times, and complaint rates (all “little y’s”).
4. Data availability
Is data available around the process metrics? If not, is it attainable? Rarely will all the data needed for a proper process improvement study be waiting around to be analyzed, but it is important that key required data can at least be collected without having to spend an unreasonable amount of time, resources, and effort.
5. Solution clarity
Is the solution already known? If so, just do it and skip going through the DMAIC motions. Keep in mind, however, that lots of people may have lots of good solution ideas, and it still may be worth going through the effort of identifying the true underlying root causes, rather than risk simply fixing symptoms.
6. Benefits
An appropriately vetted cost-benefit analysis should demonstrate the value of the project, ideally using a discounted cash-flow model to calculate the net present value or similar cash-flow analysis of the project. Do not forget to include the soft benefits such as customer satisfaction and how that translates into improved retention and higher sales.
7. Impact on service quality
Will the project contribute to enhancing overall service quality along the delivery value chain? It is not enough that end customers are satisfied if the process has become more complex and unwieldy.
8. Project sponsorship
The level of project sponsorship is often the difference between project success and failure. Strong sponsorship at an appropriately high level cannot be underestimated and is a prerequisite for all Six Sigma projects.
9. Project Alignment
Does the project align with corporate strategic objectives? If not, the likelihood of the project not getting appropriately funded and resourced increases (assuming it even gets the green light to proceed).
10. Project timeline
Can the project be completed within a reasonably short time? A good benchmark to use in most Six Sigma projects is completion in six months. If the project cannot be completed within six months, the chances of it being a viable DMAIC project diminish.
11. Probability of implementation
Practitioners should consider the probability of actually implementing a solution to the problem (assuming a correct solution will be identified), taking into account the level of acceptance or resistance by the organization or department. High cultural or organizational resistance means the probability of implementation is low. The probability of implementation also will be influenced by other factors, such as competing initiatives, significant organizational changes, or changes in strategic objectives.
12. Investment
Will the costs to fix the problem likely include large cash outlays or capital investment? If so, the odds of meeting the requirements of a good Six Sigma process improvement project diminish because gaining the investment may be difficult.
13. Team availability
This takes into account the amount of time key team members have to support this project, especially if they are also responsible for other day-to-day functions. Dedicated Green Belts and Black Belts are essential to keep the project moving forward.
14. Controllability of inputs
Although this may not be uncovered until at least some data has been collected, practitioners should make an assessment as to whether there are likely to be sufficient inputs (i.e., contributors to the output to be improved) that are both measurable and controllable. If there is little or no control over the inputs to the process, achieving the project objectives becomes daunting.
15. Process redesign
Because these criteria are designed to limit project options to those that can be improved through DMAIC, project viability is low if the process being examined cannot be improved much further without redesigning it.
Creating the Project Viability Matrix
Now that the 15 criteria are clear, it is possible to create the project viability matrix, illustrated in the table below. Note the “weighting” column next to each of the criteria. Practitioners should use this column to establish the relative importance of each of the criteria (the weighting scale ranges from 1 = least important to 5 = most important). After assigning a weight to each of the criteria, practitioners should answer each question about the project (1 = no and 5 = definitely yes).
Finding the Weighted Scores
Now it is possible to determine the individual weighted scores, as well as the total score. To find the individual weighted scores:
- Divide each weighting by 3 (e.g., a weight of 3 = 1, a weight of 4 = 4/3 or 1.3, etc.).
- In each rating column, the X marking = 1
- Multiply each X marking by its weighting (e.g., 1 x 1.3 = 1.3).
- Find the sum of all X marks for each rating column.
To find the total score:
- Multiply each weighted score by its rating (e.g., 5.3 x 2 = 10.6), and sum these products.
- Divide the sum of the products by the sum of the weighted scores (in this case, 45.4 / 16 = 2.8 ). This number is the total score.
What the Total Score Means
The total score will fall into one of three possible categories:
- Less than 2.0 – The project is not a viable DMAIC project; it may be better to use another approach.
- 2.0 – 3.0 – This is a possible DMAIC project; it will require further validation.
- Greater than 3.0 – This is a viable DMAIC project.
Some questions to which the answer is a “definite no” will automatically disqualify the project from being a DMAIC project, regardless of the overall score. For example, if the project has a known solution, no Champion support, or requires a redesign, using another approach to solve the problem may be best.
Other Useful Tools and Concepts
Looking for other ways to pick the right project? You might want to take some time to learn about project ROI. This is another vital way of determining if a project is worthy of investing time and resources.
Additionally, you might need to utilize the value index to hone in on where your priorities should lie when constructing a project. This works alongside many of the tools covered in today’s guide.